As a result of travel restrictions introduced in response to the COVID-19 pandemic, Nuclear Risk Insurers (NRI) has been unable to carry out traditional physical surveys of nuclear power plants (NPPs) for most of 2020 and has instead been conducting surveys remotely. NRI’s Engineering Surveyors have remotely surveyed three NPPs this year: Koeberg, near Cape […]